These are the Concrete Standards
29 million cubic metres of premixed concrete are produced to build and support structures across Australia every year.
The Concrete Set offers key standards and a related handbook to provide guidance around concrete structures, residential slabs and footings, construction, repair and protection, formwork and prefabrication.
The Concrete set assists in the build, protection and repair of concrete structures.
Concreters, builders, construction managers, architects and project managers will find the guidance invaluable.
Available in the Concrete set.
Name | Publisher | |
---|---|---|
AS 3600:2018 Amd 2:2021 Concrete structures | Current Standards Australia |
The 2018 edition of AS 3600 is amended as follows; the amendments should be inserted in the appropriate places. |
AS 3850.2:2024 Prefabricated concrete elements, Part 2: Building construction | Current Standards Australia |
AS 3850.2:2024 provides requirements which impact on safety in the planning, manufacturing, construction, design, casting, transportation, erection and incorporation into the final structure of prefabricated concrete elements in building construction. |
AS 3610.2 (Int):2023 Formwork for concrete, Part 2: Design and construction | Current Standards Australia |
This Standard sets out the minimum requirements for the design, erection and, where applicable, removal of formwork and the supporting falsework for cast in situ concrete. |
AS 3600:2018 Concrete structures | Current Standards Australia |
The AS 3600 Concrete code; AS 3600 2009 specifies minimum requirements for the design and construction of concrete building structures and members that contain reinforcing steel or tendons, or both; sets out requirements for plain concrete and pedestal footings. |
AS 2870-2011 Residential slabs and footings | Pending Revision Standards Australia |
Sets out requirements for the classification of a site and the design and construction of a footing system for a single dwelling house, town house or the like which may be detached or separated by a party wall or common wall but not situated vertically above or below another dwelling. |
SA HB 84:2018 Guide to concrete repair and protection | Current Standards Australia |
|
AS 3610.1:2018 Formwork for concrete, Part 1: Specifications | Current Standards Australia |
Sets out documentation, architectural and structural requirements critical to stability, strength and serviceability of the permanent structure during and after construction; and can affect the formwork design and construction. |
AS 3610-1995 Formwork for concrete | Current Standards Australia |
Specifies requirements for the design, fabrication, erection and stripping of formwork as well as the evaluation and repair of the formed concrete surface; colour evaluation charts are included in an Appendix. |
AS 3850.2:2015 Prefabricated concrete elements, Part 2: Building construction | Superseded Standards Australia |
Provides requirements for planning, construction, design, casting, transportation, erection and incorporation into the final structure of prefabricated concrete elements in building construction; applies to prefabricated concrete elements including, but not limited to, wall elements, columns, beams, flooring and facade elements used in building construction. |